Awonga Point Waste Water Treatment
Published on 29 January 2026
Due to elevated stormwater levels the Awonga Point Waste Water Treatment Facility is expected to reach full capacity within the next week.
In accordance with standard operating procedures once the treatment facility is at full capacity, stormwater from the network will be discharged simultaneously with treated effluent through the approved existing outfall infrastructure, under the Mission River